Capacity Analysis of Combined PLTD and Battery-Based PLTS in Supporting 24-Hour Electricity

  • Willy Novananda Siregar* Department of Professional Engineer, Faculty of Engineering, Universitas Bina Nusantara, Indonesia
  • Sasmoko Department of Professional Engineer, Faculty of Engineering, Universitas Bina Nusantara, Indonesia
  • Kandhi Widodo PT PLN (Persero) PUSHARLIS, Indonesia
  • Rasman Universitas Trisakti, Indonesia
  • Mimin Milasari PT PLN (Persero) PUSLITBANG, Indonesia
Keywords: Diesel Power Plant (PLTD), Solar Power Plant (PLTS), Renewable Energy, Digital Creative Economy, Energy Business Model

Abstract

Remote areas in Indonesia rely on diesel power plants with high costs, environmental impacts, and limited electricity access. Battery-based solar power offers a sustainable solution for 24-hour electricity while supporting digital economic growth. This study analyzes the combined capacity of PLTD and PLTS in providing continuous power in Sigapokna Village, Mentawai Islands. This study used comparative analysis methods, which compares conditions before and after PLTS operation. Results show that integration of 45 kW PLTD and 30 kWp PLTS increases customer operating hours from 7 hours to 10 hours per day, and planned PLTS expansion up to 170.8 kWp has potential to extend operating hours to 14 hours, even up to 24 hours with 319 kWp capacity. However, this capacity increase also impacts increased fuel oil consumption (BBM), demanding better energy efficiency strategies. These findings not only contribute to technical aspects of energy provision but also have significant implications for creative economy development and digital business in remote areas. Sustainable electricity access opens opportunities for Micro, Small, and Medium Enterprises (MSMEs) to utilize digital platforms, e-commerce, and digital financial services, while encouraging the birth of new digital-based energy business models (digital green business model) through Internet of Things (IoT) utilization, smart metering, and energy consumption data analysis. Thus, 24-hour electricity provision based on renewable energy not only improves community quality of life but also becomes a catalyst for digital economic transformation and social inclusion in Indonesia's 3T regions.

References

Ahmad, A., Hajriyanti, R., Wulandari, E. S., & Rizal, S. (2024). Digital Transformation in Rural Areas: A Case Study of Computer Training as Community Service. Jurnal Pengabdian Bangsa, 3(2), 30–38.

Andjarwati, T., & Wulan, V. R. (2021). Technology Transformation: Promoting Sustainable Indonesia MSMEs and Cooperative by Digitalization. JEJAK: Jurnal Ekonomi Dan Kebijakan, 14(2), 364–383.

Bayu, H., & Windarta, J. (2021). Tinjauan Kebijakan dan Regulasi Pengembangan PLTS di Indonesia. Jurnal Energi Baru Dan Terbarukan, 2(3), 123–132. https://doi.org/10.14710/jebt.2021.10043

Firmansyah, D., & Dede. (2022). Teknik Pengambilan Sampel Umum dalam Metodologi Penelitian: Literature Review. Jurnal Ilmiah Pendidikan Holistik (JIPH), 1(2), 85–114. https://doi.org/10.55927/jiph.v1i2.937

Harianto, B., & Karjadi, M. (2022). Planning of Photovoltaic (PV) Type Solar Power Plant as An Alternative Energy of the Future in Indonesia. ENDLESS Int. J. Futur. Stud, 5(2), 182–195.

Irfanto, I., & Sudiarto, B. (2023). Studi Pengaruh Implementasi PLTS dan BESS terhadap Kestabilan Sistem Jaringan Terisolasi di Indonesia. JTEV (Jurnal Teknik Elektro Dan Vokasional), 9(1), 84. https://doi.org/10.24036/jtev.v9i1.122721

Istiqamah, D. A., Sasongko, N. A., & Boedoyo, M. S. (2023). Analisis dampak lingkungan dan life cycle cost pembangkit listrik tenaga panas bumi. E-Jurnal Ekonomi Sumberdaya Dan Lingkungan, 12(1), 39–48. https://doi.org/10.22437/jesl.v12i1.26631

Kadang, J. M., & Windarta, J. (2021). Optimasi Sosial-Ekonomi pada Pemanfaatan PLTS PV untuk Energi Berkelanjutan di Indonesia. Jurnal Energi Baru Dan Terbarukan, 2(2), 74–83. https://doi.org/10.14710/jebt.2021.11113

Khowarizmi, M. H., & Setiyono, S. (2025). Real-Time Monitoring System for Solar Power Plants Using PLC and IoT-Based Architecture. ELKOMIKA: Jurnal Teknik Energi Elektrik, Teknik Telekomunikasi, & Teknik Elektronika, 13(2), 215.

Ma, Z., Jørgensen, B. N., Levesque, M., Amazouz, M., & Ma, Z. (2023). Business models for digitalization enabled energy efficiency and flexibility in industry: a survey with nine case studies. Energy Informatics Academy Conference, 253–270.

Manahara, S., Putri, S. K., & W, I. S. K. (2023). Tantangan transisi energi terbarukan di Indonesia. Journal of Innovation Materials, Energy, and Sustainable Engineering, 1(1). https://doi.org/10.61511/jimese.v1i1.2023.259

Putri, R. A., Rorong, I. P. F., & Tumangkeng, S. Y. L. (2023). Analisis Faktor-faktor yang Mempengaruhi Permintaan Daya Listrik Rumah Tangga di Kota Manado. Jurnal Berkala Ilmiah Efisiensi, 23(1), 133–144.

Sambodo, M. T., Silalahi, M., & Firdaus, N. (2024). Investigating technology development in the energy sector and its implications for Indonesia. Heliyon, 10(6).

Shabrina, & Rahmadhanti, F. (2024). Mendorong Program Pertumbuhan Ekonomi Hijau (Green Growth Economy) Melalui Transisi Energi Terbarukan Di Indonesia. Inovasi Makro Ekonomi (IME), 6(3).

Taneza, E., & Firdaus, F. (2024). Smart System Untuk Pemantauan Dan Optimasi Kinerja Pembangkit Listrik Tenaga Surya. Transmisi: Jurnal Ilmiah Teknik Elektro, 27(1), 20–32.

Yunus, R. F., & Adi, T. W. (2025). Comparative simulation analysis of the economics of unit commitment to determine the cost of supplying electricity in simple generating systems in the Bengkulu region. Jurnal Pendidikan Teknologi Kejuruan, 8(2), 127–140.

Published
2025-09-13
How to Cite
Siregar, W. N., Sasmoko, S., Widodo, K., Rasman, R., & Milasari, M. (2025). Capacity Analysis of Combined PLTD and Battery-Based PLTS in Supporting 24-Hour Electricity. JURNAL EKONOMI KREATIF DAN MANAJEMEN BISNIS DIGITAL, 4(1), 206-219. https://doi.org/10.55047/jekombital.v4i1.1025
Section
Articles